STELCOR was selected, rather than Auger Cast piles, due to site (overhead), equipment, and cost considerations. Gencorelli Engineering value-engineered the project for installing contractor A. R. Henry, to minimize site restrictions and control cost.
Project Summary:
- Helical Pile Type: STELCOR
- # of Helical Piles: 12
- Location: Atlantic City, NJ
- Installation Depth: 20′
- Equipment Used: Kamatsu 228 Excavator
- Challenge/Unique Aspect: Access (headroom), mobilization & cost
- Engineer/Architect: Gencorelli Engineering
- Danbro Installer: Arthur R Henry Inc.
- General Contractor: Massett Building Co.