Poplar Point Pump Station

A side of a hill needed to be removed to allow for the installation of underground piping for a pump station. The newly excavated slope needed to be stabilized to facilitate construction.

Project Summary:

  • Helical Pile Type: 1.5″ Square Shaft Soil Nails
  • # of Helical Piles: 80
  • Location: Washington, DC 20373
  • Installation Depth: 28′ – 45′
  • Equipment Used: Komatsu Excavator and 12,000 FT LB Drive Head
  • Installer: E E Cruz
  • Engineer/Architect: GEI Consultants