Playland

This section of the Amusement Park was supported by failed timber piles and additional load was being added with new rides. Access was limited (overhead & working between existing piles) and restricted by a competing Boardwalk replacement project which narrowed the access window for the project.

Project Summary:

  • Helical Pile Type: RS 2 7/8″
  • # of Helical Piles: 130
  • Location: Ocean City, NJ
  • Installation Depth: 15′
  • Equipment Used: Excavator & a Dingo
  • Challenge/Unique Aspect: Access (headroom), timeframe – competing project limiting access
  • Engineer/Architect: Bob Green Engineering
  • Danbro Certified Installer: Coastal Marine Piling