An active seaside resort used of helical piles as foundation support for a pump station and sewer lines.

Project Summary:

  • Helical Pile Type: IDEAL 2 7/8″ Pipe Piles (203 wall)
  • # of Helical Piles: 45
  • Location: Orchard Beach, ME
  • Installation Depth: 20′ – 30′
  • Helix Plates/Ultimate Pile Capacity: 10″ 12″ 14″ / 40 Kips
  • Challenge/Unique Aspect: The usual suspects on sewer projects were at issue and confirmed the wisdom of specifying helicals: no vibration, noise reduction, traffic flow and an overall neighbor friendly installation.
  • Danbro Installer: Shaw Bros.
  • Engineer/Architect:
    S.W. Cole Engineering – Geotechnical
    Geosciences Testing and Research – Structural
  • General Contractor: Shaw Bros.