The theater is located on environmentally sensitive wetland area. The grouted helical micropiles were chosen to support the large loads in varying FILL layers with no soil disturbance.
Project Summary:
- Helical Pile Type: 1.75″ SS with 6″ grout column
- # of Helical Piles: 160
- Location: Millville, NJ
- Installation Depth: 35 Feet
- Equipment Used: Volvo excavator, 12K drive Head and an 8″ Auger
- Challenge/Unique Aspect: Predrilling was required to reach the required depth for the pile.
- Engineer/Architect: Underwood Engineers