Super Storm Sandy related flooding caused differential settlement to the foundation which now required a deep foundation to support the structure.
Project Summary:
- Helical Pile Type: SS 150
- # of Helical Piles: 35
- Location: Sea Isle City, NJ 08243
- Installation Depth: 27′
- Equipment Used: Hand-held
- Challenge/Unique Aspect: Access (crawlspace), Mobilization (portable/hand held install)
- Engineer/Architect: Butch Czar
- General Contractor: East Coast Helical Piers