Addition to the world famous Corvette Dealership once owned by Kerbeck. Ciocca decided to upgrade the show room facilities after acquisition and due to variable live loads, needed a solid foundation.
Project Summary:
- Helical Pile Type: 2875.203
- # of Helical Piles: 106
- Location: Atlantic City, NJ
- Installation Depth: 25′-35′
- Helix Plates/Ultimate Pile Capacity: 10″12″14″ 24K DL
- Equipment Used: Excavator with Prodig 12K5 Drivehead
- Challenge/Unique Aspect: No Vibration and minimal pile installation disturbance was necessary as an existing Corvette showroom was still in service as the work proceeded.
- Danbro Installer: Titan Shoring & Construction
- Engineer/Architect:
Underwood Engineering – Geotechnical Engineers
Stephen Beltz – Architects
Elton & Thompson – Structural