Ciocca Cadillac

Addition to the world famous Corvette Dealership once owned by Kerbeck. Ciocca decided to upgrade the show room facilities after acquisition and due to variable live loads, needed a solid foundation.

Project Summary:

  • Helical Pile Type: 2875.203
  • # of Helical Piles: 106
  • Location: Atlantic City, NJ
  • Installation Depth: 25′-35′
  • Helix Plates/Ultimate Pile Capacity: 10″12″14″ 24K DL
  • Equipment Used: Excavator with Prodig 12K5 Drivehead
  • Challenge/Unique Aspect: No Vibration and minimal pile installation disturbance was necessary as an existing Corvette showroom was still in service as the work proceeded.
  • Danbro Installer: Titan Shoring & Construction
  • Engineer/Architect:
    Underwood Engineering – Geotechnical Engineers
    Stephen Beltz – Architects
    Elton & Thompson – Structural