A new Psychiatric office was being built in Great River, New York. Due to the unstable soils, a deep foundation was required. Helical Piles came to the rescue.
Project Summary:
- Helical Pile Type: 1.75″ Square Shaft
- # of Helical Piles: 100
- Location: Great River, NY
- Installation Depth: 30′
- Ultimate Pile Capacity: 80 Kips
- Equipment Used: Large Excavator, 30K Drive Head
- Challenge/Unique Aspect: Using a larger machine, the contractor was able to use longer extensions, which resulted in quicker installation times and a quicker project completion date.